Well till tomorrow at least. He came by today to make sure he knew what parts to bring for the work tomorrow. He should be here bright and early, which is bitter sweet for a Sunday! Well Rory didn't let that delay stop him any, while I fought with some weeds out front, he got a lot of work done in the bathroom. It may not look pretty yet but we can really see the improvement.
He cut a hole in the outside wall for the access to the whirlpool tub motor in case there is ever a need to access it, we don't have to destroy our tiled tub surround.
Baxter of course thought it was a custom doggy door for him.
Rory quickly sealed up the gaping hole with this pre made access door. He put silicone all over the seam and screwed it into the framing, it just needs to be painted the same color as the wall and it's done.
Rory framed in a custom recessed soap holder for our shower.
He also replaced all the rotten wood with new, and the footing with properly pressure treated 2x4's.
And he got a bit of drywall up in the meantime.
Saturday, March 20, 2010
Subscribe to:
Post Comments (Atom)
1 comment:
Plumbers play an important role in building a new structure or home where plumbing systems have to be installed.
Plumber Prahran
Post a Comment